Page 2 of 2

Re: Marinette 39 Sedan Transport

Posted: Tue Jun 12, 2018 11:07 am
by shade2u2
Flybridge put to bed for transport...

Re: Marinette 39 Sedan Transport

Posted: Tue Jun 12, 2018 11:09 am
by shade2u2
Strapping down to get on the road...

Re: Marinette 39 Sedan Transport

Posted: Tue Jun 12, 2018 11:10 am
by shade2u2
Arriving at ramp in Marietta (Williamstown, WV)

Re: Marinette 39 Sedan Transport

Posted: Tue Jun 12, 2018 6:38 pm
by javalin390
Glad to see she made it safe down there John. Now comes the joy of re-assembly !

Re: Marinette 39 Sedan Transport

Posted: Tue Jun 12, 2018 7:46 pm
by shade2u2
Jim
Thank you for stopping by and offering advice.
It was nice to meat you.
Carl from this forum came by but I got caught up with the trucker and didn’t get to speak with him much.
Here she is at the dock.

Re: Marinette 39 Sedan Transport

Posted: Mon Jun 18, 2018 11:05 am
by shade2u2
Well... I got the flybridge sat back in place before the rain. RE-CONNECTING can begin.
I did get the roof painted before setting the bridge back. I used Interlux "Interdeck" Non-skid. It looks good now & I will see how it holds up.

Re: Marinette 39 Sedan Transport

Posted: Wed Jul 04, 2018 3:51 pm
by shade2u2
Well after being out of town for a couple of weeks I am finally getting serious about reconnecting things.
The flybridge is bolted down and the railing is re-installed.
On new non skid paint with nylon washers.